Recently we have Installed Windchill 10.1 with certain versioning scheme in which A1 comes after A10 and I have uploaded all the legacy data with that versioning scheme now i realise that A1 should be before A10. I am afraid that if I change the version order the data may get corrupt. Can I have a work aroud for that? Later after the data loading I will be disabling A1 as legacy version.
↧