We do not have a solution but certainly are in need of one. We are writing a Change Notice because to link objects to the WTPart we must check out the WTPart. Perhaps it is just a recently migrated WTPart with no link to a CAD Document/Drawing. We cannot check out the WTPart unless the WTPart exists on a Change Notice. If a drawing is associated with the part, we must revise the drawing to show the part revision advanced. We are adding a note to the description column of the CN to advise Procurement and others the revision is a requirement of Windchill and nothing actually changed. I am an End User and the process above is currently stated as required by our Admin. There is a lot of work being required by this process. There must be a better solution.
↧