We ended up having to bring in the top assembly of each product in to the Workgroup manager and checking them in product by product. The main issues doing it this way:
- You lose the historical data from ePDM
- Very time consuming to weed through the multiple errors and warnings
- Conflicts arise when using the same parts in different products.
- You can do some work to synch them, but it is also very time consuming
We couldn't find an easier answer, but doesn't mean there isn't one out there.