Lori,
I have a related question. I am in the process of instituting PDM Essentials for my organization. I want to use the MILSTD. First, where do I discover what our system is set to, and how do I change it?
Second, it seems that what we have now is this:
First Check in: -.1 (In Work)
Iterate: -.2, -.3 (In Work)
Revise: A.1 (Released)
Iterate: A.2, A.3 (In Work)
Revise: B.1 (Released)
Iterate: B.2, B.3 (In Work)
I'd rather it do this:
First Check in: -.1 (In Work)
Iterate: -.2, -.3 (In Work)
Revise: A (Released)
Iterate: A.1, A.2 (In Work)
Revise: B (Released)
Iterate: B.1, B.2 (In Work)
I especially want released drawings to show just a letter, not a letter plus an iteration, and I'd rather not have to do this by making the drawing revision a note instead of a displayed parameter.
Can I do this, and if so, how?
Regards,
Eric